A Lost Opportunity: $8.2 Trillion on New Nukes cuts CO2 only 9%?
Nov 17, 2016 - 32:52
Radio and PodcastLive Radio & Podcasts
The shutdown of the Diablo Canyon nuclear power plant with its two atomic reactors by 2025, announced by utility owner Pacific Gas and Electric (PG&E) in June 2016, is a joint proposal among PG&E and environmental and la...
Diablo Canyon: The Devil’s in the Details; Part 1: A Troubled History is an episode from Fairewinds Energy Education Podcast by Fairewinds Energy Education. The shutdown of the Diablo Canyon nuclear power plant with its two atomic reactors...
This episode belongs to Fairewinds Energy Education Podcast.
Use the player on this page to stream the episode online.
Published Aug 18, 2016, 15:22 long, audio available.
The shutdown of the Diablo Canyon nuclear power plant with its two atomic reactors by 2025, announced by utility owner Pacific Gas and Electric (PG&E) in June 2016, is a joint proposal among PG&E and environmental and labor organizations. This action is neither the beginning nor the end to the decades long story of Diablo Canyon’s design, construction, and operation. PG&E’s promise to replace the nuclear power generated by Diablo Canyon’s two reactors with renewable energy and to no longer seek a 20-year license renewal for these atomic reactors comes with a cost. The two reactors located on multiple California fault lines will continue to operate for nearly a decade more. In this Fairewinds Energy Education Podcast series, the Fairewinds Crew will share the troubled history of Diablo Canyon and speak with the leading activists in opposition to Diablo Canyon’s ominous 50-year presence along the California coast. Almost from the day it was proposed in the mid-1960’s, Diablo Canyon has encountered more problems than any other nuclear plant still operating. During Part 1 of the Fairewinds Podcast series “Diablo Canyon: The Devil’s in the Details”, Fairewinds’ Chief Engineer Arnie Gundersen exposes the plant’s long sequence of problems and shows that the Nuclear Regulatory Commission’s (NRC’s) complicity is the only reason these two reactors continue to operate.
You can listen to Diablo Canyon: The Devil’s in the Details; Part 1: A Troubled History online on Radio and Podcast. Open the player on this page to stream the available audio.
Diablo Canyon: The Devil’s in the Details; Part 1: A Troubled History is an episode from Fairewinds Energy Education Podcast by Fairewinds Energy Education.
This episode is 15:22 long.
This episode was published on Aug 18, 2016.
Yes. Use the heart button on the episode page to add it to your favorite episodes list.
Yes. This page shows related episodes from Fairewinds Energy Education Podcast when more episodes are available from the podcast feed.
You can listen to Diablo Canyon: The Devil’s in the Details; Part 1: A Troubled History on this page when the episode audio is available from the podcast feed.
Diablo Canyon: The Devil’s in the Details; Part 1: A Troubled History is from Fairewinds Energy Education Podcast by Fairewinds Energy Education.
Published Aug 18, 2016 and 15:22 long