
Mini Ep 7 - Who was Queensland Railways first female architect?
Mar 13, 2026 - 21:56
Radio and PodcastLive Radio & Podcasts
Episode 21 - The Merivale Bridge On Saturday, 18 November 1978, the Merivale Railway Bridge, connecting Roma Street and South Brisbane Railway Stations was officially opened in the presence of 850 official guests. Crossi...
Ep 21 - Why did it take 100 years to build this vital bridge? is an episode from The Queensland Rail History Podcast by Queensland Rail. Episode 21 - The Merivale Bridge On Saturday, 18 November 1978, the Merivale Railway Bridge, connecting...
This episode belongs to The Queensland Rail History Podcast.
Use the player on this page to stream the episode online.
Published Dec 5, 2024, 36:43 long, audio available.
Episode 21 - The Merivale Bridge On Saturday, 18 November 1978, the Merivale Railway Bridge, connecting Roma Street and South Brisbane Railway Stations was officially opened in the presence of 850 official guests. Crossing the Brisbane River, the bridge was constructed over a period of three years and three months and reported to have cost $20.6 million. In today's episode we discuss why the Merivale Bridge is still so important for Brisbane train travellers. We also chat with Brad Sutton, Asset and Structures Manager at Queensland Rail and hear about the work involved in maintaining the structure. Images discussed during the episode can be found here . Some great historical images of the opening are available here .
You can listen to Ep 21 - Why did it take 100 years to build this vital bridge? online on Radio and Podcast. Open the player on this page to stream the available audio.
Ep 21 - Why did it take 100 years to build this vital bridge? is an episode from The Queensland Rail History Podcast by Queensland Rail.
This episode is 36:43 long.
This episode was published on Dec 5, 2024.
Yes. Use the heart button on the episode page to add it to your favorite episodes list.
Yes. This page shows related episodes from The Queensland Rail History Podcast when more episodes are available from the podcast feed.
You can listen to Ep 21 - Why did it take 100 years to build this vital bridge? on this page when the episode audio is available from the podcast feed.
Ep 21 - Why did it take 100 years to build this vital bridge? is from The Queensland Rail History Podcast by Queensland Rail.
Published Dec 5, 2024 and 36:43 long