
Radio and PodcastLive Radio & Podcasts
Government & Organizations
Bridge construction reaches mid-point, quality of Head Start programs threatened
In Santa Cruz, the three-year Murray Street Bridge seismic retrofit has reached its mid-point. And, the Trump administration wants to streamline Head Start regulations for class sizes, teachers’ qualifications and more.
About This Episode
Bridge construction reaches mid-point, quality of Head Start programs threatened is an episode from KAZU - Listen Local Podcast by 90.3 KAZU. In Santa Cruz, the three-year Murray Street Bridge seismic retrofit has reached its mid-point. And...
Podcast
This episode belongs to KAZU - Listen Local Podcast.
Listen Online
Use the player on this page to stream the episode online.
Episode Details
Published Aug 7, 2026, 2:20 long, audio available.





